Go homepage(回首页) Upload pictures (上传图片) Write articles (发文字帖)
The author:(作者)归海一刀published in(发表于) 2014/5/3 9:46:49 Guangzhou-Shenzhen railway trains caused by equipment failures to varying degrees delayed
"The Guangzhou-Shenzhen railway trains with varying degrees of late," May 1, 7:16, xiancun to shilong district, between equipment failures, Guangzhou-Shenzhen railway trains caused by varying degrees of late. Fault lifted in 8:31, to resume Guangzhou-Shenzhen line order of train operation, railway authorities temporarily suspended 3 pairs of trains, namely G7170/1, G7180/1, and G7160/1.
【广深线多趟列车出现不同程度晚点】5月1日7时16分,因仙村至石龙区间设备故障,致广深线多趟列车出现不同程度晚点。故障于8时31分解除,为尽快恢复广深线列车运行秩序,铁路部门临时停运3对列车,分别是G7170/1、G7180/1、G7160/1次。
赞