Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)qq
published in(发表于) 2014/6/12 5:06:36
Guangzhou to Chengdu starting in July to operate trains

Trains from Guangzhou to Chengdu in July will be put | | EMU trains _ news

South reporter Xiong Wei's wei Hu Xiangjiang from July 1 0 o'clock, national railways new train diagram. Guangzhou and Chengdu will open more direct express, the whole nearly 4 hours less than the current. After the adjustment, better freight services. In Beijing, Shanghai, Guangzhou and Shenzhen planned to open between 3 to 6 column one direct express trains stop.


July 1, some trains to improve grades or outage


The Guangzhou Railway Group, released yesterday, the train schedules change, ordinary-speed railway opened in Guangzhou, Guangdong Province, to Chengdu to Dalian, Guangzhou, Qingdao, Shenzhen to 3 for passenger cars. Guangzhou-Chengdu Z122/3, respectively Z124/1 time trains, three hundred and sixty nine-eighths, k-370/67/70, k-Dalian, Guangzhou-Qingdao and Shenzhen/9 express k-one thousand six hundred and eighty eight-fifths, k-one thousand six hundred and eighty six-sevenths Express. Among them, from Guangzhou to Chengdu trains full of needs at least 24 hours and 43 minutes, compared with the existing general speed train full time for almost 4 hours.


Guangzhou Railway Group also said that after the July 1 implementation of the new timetable, Beijing-Guangzhou, Guangzhou-Shenzhen-Hong Kong rail 134 arrangements for bullet trains, representing an increase of the current 18. The peak railway up to 22.5 peak trains can be arranged, Beijing-Guangzhou, Guangzhou-Shenzhen-Hong Kong can arrange 156.5 up high-speed bullet trains, than the present increase of 23.5. July 1 adjustment operation section, there are some trains route, some trains to improve grades or outage. 1470/1,1472/69 change to express train from Hangzhou to Harbin, the entire running time of 16 hours, 59 minutes. Air conditioning in some of the ordinary-speed passenger trains into the train.


Relevant information can be logged on official website of the Guangzhou Railway Group, Guangzhou Railway official micro-blog today or call 12306 service calls.


 First Bank of Chengdu-Chongqing area to compass EMU


According to the new train diagram, national railways to operate passenger trains 60.5, including 53 additional bullet trains. Run the figure after adjustment, the national total number of passenger trains on railways to 2447, 1330 on which bullet trains.


The adjustment of optimized passenger train plan, Beijing-Shanghai, Beijing-Guangzhou, Beijing-Harbin line, Shi-Tai passenger dedicated, as well as Hang Shen trunk line transport capacity has been expanded. Among them, the Beijing-Shanghai high-speed train action for least busy section opened 101, jingguanggaotie's busiest sectors opened train 100 pairs. First ever running the Chengdu-Chongqing to Shanghai, Hangzhou, Nanjing, Xiamen, Fuzhou, Wuhan, the direction of EMU trains. Daily, weekend, peak passenger prevail three runs.


(Original title: will bring 18 of the Beijing-Guangzhou, Guangzhou-Shenzhen-Hong Kong rail EMU train)

06:00 on June 12, 2014 The Southern Metropolis daily


If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759