Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)qq
published in(发表于) 2014/6/19 4:46:12
Capital Airport line westward extension will connect with Line 5 line, opened in 2017

Capital Airport line westward extension will connect with Line 5 line opened in 2017 _ | | airport expansion of the capital airport news

Legal evening news (reporters Bai Bing) last July 1, capital Airport line westward extension project EIA started the second show. According to the EIA report, Airport line westward extension would extend 1.9 kilometers, setting beixinqiao station on Line 5 and line transfer. Is scheduled for January next year build, and by December 2017 line opened.


Municipal environmental protection Science Research Institute official website shows that airport existing airport line line westward extension project start dongzhimen station, along the Dong Zhi men Street to the West and finally, beixinqiao, 1.9 km long line, set the beixinqiao station. Lines are all underground lines, with Line 5 line transfer station. Construction of the project began in January 2015. This reporter learned that, in March this year, the project was first published. According to plan, scheduled to begin this year and to open in 2015.


According to the EIA report, the West extension line will be built and existing airport line operations, operational periods from 6 o'clock to 23 o'clock, throughout the day for 17 hours. Report concludes that, from the point of view of environmental protection, Airport line westward extension project line is reasonable, does not have a significant impact on the surrounding environment, the construction, the operation is feasible. According to the project before July 1, which are accessible through the Beijing Academy official website enquiries telephone and e-mail submissions.


  Airport Express repeatedly reduced the minimum departure interval


On June 10, 2012: rush hour trains a minimum interval reduced from 10 minutes to 8 minutes and 30 seconds


On December 15, 2013: evening rush hour minimum interval adjusted by 8 minutes and 30 seconds to 7 minutes and 30 seconds


2020: minimum headway is expected to shrink to less than 4 minutes


(Original title: Airport line Western extension began in January next year, Dong Zhi men bridge to beixinqiao with Line 5 line transfer in 2017)

15:07 June 19, 2014 Legal evening news


If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759