Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)
published in(发表于) 2016/8/22 9:46:57
2022 the water cube will be turned “ice cube“,

English

中文

2022 the water cube will be turned "ice cube"-the water cube, bird's nest, the Olympics-IT information

Modification plan before the end of the field determined by height zoning control temperature of air conditioning system

The 2008 Beijing Olympic Games despite the past 8 years, as a legacy of the bird's nest, water cube, Wukesong Olympic sports stadium and there is no fade out of view along with the wonderful end of the Beijing Games, but on the contrary become new landmarks of Beijing and held numerous large-scale events. The heat of summer, you can experience professional lanes at the water cube Olympic athlete's passion for sports, you can also stroll at the bird's nest in the schoolyard, nest of exquisite. The 2022 Winter Olympics, and six years later, part of the Beijing Olympics will be "turned" Olympic Stadium, the water cube will be the curling venue. At present, the water cube is curling Hall design, structure, research and testing, in pursuit of the final reform plan before the end of this year.

Start design

Leisure paradise and professional Lane said the water cube, let alone Beijing tourists, even been admired by many tourists. Cool here in summer and winter water temperature comfortable, one year most of the time you can "bubble" enjoy the fun of swimming at the water cube.

Accompanied by 2022 Winter Olympics venue of the dust has settled, the water cube were identified for the 2022 winter games and Winter Paralympic Games men's and women's curling and wheelchair curling competition venue. National Aquatics Centre (the water cube) General Manager Yang Qiyong, said by the World Curling Federation of related technical standards, the water cube will be the game Hall design, research and testing, as well as the design of the Olympic curling competition venue facilities.

Water cube game until 2022 will be transformed into the Hall is equipped with 4 standard curling ice arena, part of the event facilities, such as temporary audience, athletes locker room, barrier-free transportation, temporary facilities, will be completed according to future needs in due course.

Temperature control of field implementation of subregional

Yang Qiyong introduced, existing game Hall interior environment suitable for the water cube swimming events, but not meet the regional temperature curling. To this end, the water cube related departments and experts in the field and university research institutes to carry out demonstration, through simulation, upgraded air conditioning temperature control system partitions, to ice surface temperature-8.5, the ice more than 1.5 meters height above 10 ℃, stands the temperature 16-18 ℃ needs so that athletes and spectators in a comfortable environment in the tournament. Meanwhile, increase the dehumidification function, adjustment of artificial lighting modes, adding sound-absorbing curtains, ensure the quality of the ice and television effects, improving the acoustic environment of the venue.

Yang Qiyong introduced, field structure conversion aspects intends used steel wood support system and the mobile type business ice equipment, conversion completed Hou not only can hosted world top ice pot events, also can undertake spent sliding, and short road speed skating, events, and achieved ice class events, and swimming events, and activities site between flexible conversion, makes national swimming Center while has "water cubic" and "ice cubic" property.

Underground ice arena is expected to open late next year

Meanwhile, new underground water cube to be in the South square ice rink, the rink is expected to open in the fourth quarter next year. Water cube Plaza ice rink construction area of 8453 square meters, reserved curling circuit, mainly in underground space, without reducing the green area, without affecting the landscape. According to reports, the South square ice rink curling track while racing, it can provide warm up venue, ease the curling venue in Beijing with scarcity. Permanent curling track as Olympic legacies after the game for the public to experience the open public skating. In addition, the water cube also plan the Winter Olympics and cultural exhibition area.

Wukesong stadium was embedded ice-making equipment

With Beijing Olympic legacy of the Wukesong Stadium will be borne by 2022 Winter Olympics ice hockey events, the 1800 square basketball venue will be transformed into ice. Brand Director of five pines gymnasium Yuan Yinghui introduced at the beginning of the construction of five pines gymnasium, it has embedded from Germany to introduce full ice system, and transformation of the field will be smaller, with preparations for the Winter Olympics to move more to the background room, Auditorium and the locker rooms and other facilities rehabilitation and construction. Meanwhile, Wukesong stadium is also planning to create two new ice hockey stadium to the Southeast site.

In addition to the hockey game, Beijing Wukesong arena in the future will become a fashionable life. Yuan Yinghui introduced in early November, at the Wukesong main stadium on the West side, covering about Hi-up life size of seven football fields will be built and opened. At present, the Hi-up circle and Wukesong station opened, people can train without having to go to the ground to direct access to the circle of life.

Extension news

World class ski racing long settled in the bird's nest

After successfully obtained the right to host the 2022 Winter Olympics, Beijing National Stadium (bird's nest) will be the first summer and winter "double Olympic" venue for the opening and closing ceremonies. After Chinese and foreign visitors to Beijing bird's nest has become the must see attractions. Beijing National Stadium (bird's nest) Assistant General Manager Li Zhiqun introduced since October 2008 after the Beijing Olympics Opening operations until the end of 2015, the bird's nest today to receive foreign tourists more than 26 million visitors, various game show more than more than 240 times, including events involving more million people more than more than more than 110 times, achieving an average annual operating revenue of about 200 million Yuan and have been profitable.

Now the nest is not only Olympic sports venues, as well as 5 a-class tourist attractions. Li Zhiqun introduced, in order to enhance the travel experience of tourists, perfect nest Stadium identify systems, the introduction of multimedia navigation system, opened a visitor information service window, providing free interpretation service, a number of measures. And development of a VIP tour of the Olympic Games, "beauty" featured cruise line the bird's nest, attracted a lot of tourists, the line north to South to experience line, set to visit, experience, shopping in one.

As the 2022 Winter Olympics approach, introducing world class ski racing long settled in the bird's nest, such as "boiling snow" world snowboarding competition has been held five times, FIS freestyle ski aerials World Cup has been successfully held three sessions, events not only ornamental growing, visitors are also increasing.

Continuous held seven session of nest ice quarter is winter Beijing public most familiar of ice movement project one of, this year of ice quarter nest set has ice hockey, and ice pot, and off-road ski, and winter two items, 10 items winter Austrian project of experience district, and opened has two article professional ski road and standard ice rink and the fine winter Austrian ice sculpture exhibition, altogether attract has about 200,000 passengers in nest participation ski, and skating. It also makes this stage seven consecutive winter activities total participants to more than 1.4 million visitors.


2022年水立方将变身“冰立方” - 水立方,鸟巢,冬奥会 - IT资讯

赛场改造方案年底前确定 空调系统按高度分区控温

2008北京奥运尽管已过去8年,作为奥运遗产的鸟巢、水立方、五棵松等奥运体育赛场并没有随着北京奥运的精彩落幕而淡出人们视线,相反却成为北京新地标和众多大型活动的举办地。夏日炎炎,您可以在水立方的专业泳道里体验奥运健儿的运动激情,也可以漫步在鸟巢的空中走廊,一览鸟巢的精美绝伦。而六年后的2022年冬奥会,部分北京奥运会赛场将“变身”冬奥赛场,其中水立方将成为冰壶比赛场地。目前,水立方正在进行冰壶比赛大厅改造设计、结构研究和试验,力争在今年年底前确定最终改造方案。

启动相关改造设计

说起水立方嬉水乐园和专业泳道,别说是北京游客,连很多外地游客都慕名而来。这里夏天凉意袭人,冬日水温舒适,一年大部分时间您都可以“泡”在水立方享受游泳的畅快。

伴随着2022年冬奥会举办地的尘埃落定,水立方被确定为2022年冬奥会及冬残奥会男、女冰壶和轮椅冰壶比赛场地。国家游泳中心(水立方)总经理杨奇勇介绍说,按照世界冰壶联合会相关技术标准,水立方将进行比赛大厅改造设计、结构研究及试验事宜,以及冬奥会冰壶赛事场地配套设施的设计。

水立方比赛大厅在2022年之前将转变成为设有4条冰道的标准冰壶赛场,部分赛事配套设施,如临时观众席、运动员更衣室、无障碍交通设施、临时设备等,将根据未来需求适时完成。

赛场实现分区域温控

杨奇勇介绍,水立方现有比赛大厅的室内环境适于游泳赛事,但不能较好满足冰壶比赛各区域温度规定。为此,水立方相关部门与该领域专家及高校科研院所开展论证,通过模拟分析,升级空调系统实现分区控温,达到冰面温度-8.5℃,冰面以上1.5米高度10℃以上,看台温度16-18℃的需求,使运动员及观众处于舒适的赛事环境中。同时,增加除湿功能,调整人工照明模式,加设吸声幕布,确保冰面质量和电视转播效果,改善场馆声学环境。

杨奇勇介绍,赛场结构转换方面拟采用钢木结构支撑体系及移动式制冰设备,转换完成后不仅可承办世界顶级冰壶赛事,还可以承接花滑、短道速滑等赛事,并实现冰类赛事、游泳赛事、活动场地间灵活转换,使国家游泳中心同时具备“水立方”与“冰立方”属性。

地下冰场有望明年底开放

同时,水立方拟在南广场新建地下冰场,该冰场有望在明年第四季度对外开放。水立方南广场冰场建筑面积约8453平方米,预留冰壶赛道,以地下空间为主,不降低绿地面积,不影响广场景观。据介绍,南广场冰场的冰壶赛道可在赛时提供热身场地,缓解北京市冰壶场馆稀缺问题。赛后永久保留冰壶赛道作为奥运遗产供市民体验,开放群众滑冰。此外,水立方还计划设冬奥文化展示区。

五棵松体育馆已预埋制冰设备

同为北京奥运遗产的五棵松体育馆将在2022年承担冬奥会冰球项目比赛,1800平方米的篮球场地届时将改造成冰面。五棵松体育馆品牌部总监袁颖慧介绍,在五棵松体育馆建造之初,就已预埋了从德国引进的整套制冰系统,因此赛场、改造工程将会小一些,冬奥会筹备将更多转移到后台用房、观众席和更衣室等配套设施的改造和建设。同时,五棵松体育馆还计划在主场馆东南方向新建两个冰球场地。

除了冰球比赛,未来的五棵松体育馆将成为北京又一个时尚生活圈。袁颖慧介绍,今年11月初,位于五棵松主体育馆西侧占地约七个足球场大小的Hi-up生活圈将建成并对外营业。目前,Hi-up生活圈已经和五棵松地铁站打通,市民下地铁后无需走到地面便可直接进入生活圈。

■新闻延伸

世界级滑雪赛事长期落户鸟巢

成功获取2022年冬奥会举办权后,国家体育场(鸟巢)将成为首座举办夏季、冬季“双奥会”开闭幕式的场馆。鸟巢早已成为中外游客到北京后的必去景点。国家体育场(鸟巢)总经理助理李质群介绍,自2008年10月北京奥运会后开放运营至2015年底,鸟巢累计接待中外游客超过2600万人次,举办各类赛演活动240余场次,其中参与人数万人以上的大型活动110余场次,实现年均营业收入约2亿元并已实现盈利。

现在的鸟巢已不仅仅是奥运会运动场馆,同时也是5A级旅游景区。李质群介绍,为了提升游客的游览体验,鸟巢完善场馆标识系统、引进多媒体导览系统、开通游客咨询服务窗口、提供免费讲解服务等多项措施。同时开发了奥运贵宾游、“顶美”鸟巢特色游览线路,吸引了不少游客,该线路为南北贯通的深度体验线路,集参观、体验、商业购物于一体。

随着2022年冬奥会的临近,鸟巢引入世界级滑雪赛事长期落户,如“沸雪”世界单板滑雪赛已连续举办五届,国际雪联自由式滑雪空中技巧世界杯已成功举办三届,不仅赛事观赏性越来越强,专业观众也在逐年增多。

连续举办七届的鸟巢冰雪季是冬季北京市民最熟悉的冰雪运动项目之一,今年的冰雪季鸟巢设置了冰球、冰壶、越野滑雪、冬季两项等10项冬奥项目的体验区,并开辟了两条专业滑雪道和标准冰场及精美冬奥冰雕展,一共吸引了约20万人次在鸟巢参与滑雪、滑冰。这也使得这项连续举办七届的冬季活动累计吸引参与者超过140万人次。






If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759