Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)
published in(发表于) 2016/9/24 16:17:48
Most beautiful wild great wall repairs being questioned, women engineers surveyed the silence hang

English

中文

Most beautiful wild great wall repairs being questioned engineers surveyed the silence hang | | | cultural relics of the great wall _ in the wild news

Original title: the most beautiful wild great wall "to" flat road "," protection "works really do compliance?


Bodkin Hill big Hill section of the great wall repairs the appearance of Xinhua News Agency

On the occasion of the 10 anniversary of the promulgation of the regulations on the protection of the great wall, from Liaoning, a wild great wall recently became the focus of media attention. On one side is the State administration of cultural heritage of the wild great wall in the repairs was "flat road", is the cultural relics Department insisted that according to the procedure for maintenance. Are protected, or is damaged? Journalists were investigated.


  Progress


  Shell will disappear in 35 years or so?


Recently, a "wild great wall is the most beautiful mortar trowel" post in online triggered heated discussion. Some netizens said, so repair is not to fix, is damaged.


23rd at noon, reporters mountain view awl Hill big Hill section of the great wall looks after the repair, as photos published on the network can see, the original incomplete crenel wall is smooth, tidy stone surface of leiqi a layer of gray-white covering, making it more like a "flat". And compared to the great wall near the floor bricks, retaining pilaster, which stretches 500 metres "flat road" seems abrupt.


Local cultural relic Department official, so is repeated by experts discussing the options form. Before servicing, this section only broken stone Foundation, in order to avoid wanton pedaling mountain climbers, as well as rain, freezing weather caused greater damage, programmes, reinforcement, scattered on the ground outside the stone back in its place, then proceed to grouting, solid reinforcement.


Bureau of cultural relics, Liaoning province, Ding Hui admitted that "flat road" does not look good, but in line with the urgent protection needs. This is slightly higher in the Middle, low on both sides of the plate-like, and covered with a layer of concrete, waterproofing effect, against rain in summer and prevents water freeze in winter. He stressed that this section of the great wall is the emergency repair, is to prevent the acceleration of the great wall damage, "beautiful" is not the most important.


According to the Beijing news report yesterday, the State Bureau of cultural relics, Liaoning Provincial Bureau of cultural relics formed a joint investigation team, investigation and evaluation on this matter. After on-site investigations, expert fuqingyuan, a member of the investigation group, "said so-called cement pavement does not exist, used is 37 lime-shell, for protection. This skin will be gone in 35 years or so weathered. ”


  Background


  Maintenance received more than 10 million of subsidy funds


Statistics show that wall located in suizhong County in Liaoning province yongan awl mountain is a national key cultural relics protection units, was built in the Ming dynasty 14 years (1381), Liaoning in main line of the great wall of the Ming dynasty.


Awl mountain section of the great wall is located between the Yanshan mountains and steep mountains, plus here is located in the mountains, genuine, someone called it "the most beautiful wild great wall".


This reporter has learned, the renovation of the great wall is about 1200 meters long. In 2011, the suizhong County Bureau of cultural relics of the great wall as a whole badly damaged, part of danger, commissioned by the design of Liaoning province cultural relics protection center maintenance program. Subsequently, the programme continuously through the provincial cultural heritage Bureau and the State Bureau of cultural relics expert, received State subsidies of more than 10 million Yuan.


Maintenance divided into 4 sections, by tendering procedures, respectively, from Dalian, Liaoning province, Shenyang, and four ancient building company construction in Qufu, Shandong, where as a bid by Dalian ancient garden of 500 meters of the great wall Foundation repair, cost more than 3 million Yuan, Liaoning specialized agencies but also the whole-process supervision to the construction. Project started in July 2013, completed in November 2014, and now has been accepted by Liaoning province cultural heritage organization technical, is submitted to the State Bureau of cultural relics to final acceptance.


While surveying the site, the reporter saw sending Dalian ancient garden construction information companies and heads of several ancient garden construction company in Qufu, Shandong. They said despite the difficult conditions, but in strict accordance with the design and construction of the company, completely by hand bags of lime and loess from the foot back.


  Question


  Repairs, maintenance procedure, doubts a lot


Provided for in the regulation on the protection of the great wall to repair the great wall a very rigorous process. Applications for maintenance and design needed to declare to the cultural relics Department in layers, cultural relics departments at all levels to organize expert group review, engineering design, construction, supervision and other units must have the appropriate qualification.


During this maintenance, although relevant qualification is complete and strict compliance with the prescribed procedures, but some places still dubious.


  1. drain is blocked


23rd survey of journalists found that even a newly-built area, great wall ground drains have been mud, gravel, blocking routine inspections, maintenance of this section of the great wall in the local work is poor.


  2. use concrete blocks is difficult to smash


Reporters on the River at the foot of the mountain village visits, a number of villagers, then repair the great wall, villagers make money by cement back up the mountain. "Smooth" wall not far away, reporters found several bags containing suspected frozen chunks of concrete, smashed with stones are hard to break.


Reporters call ancient gardens in Dalian company surnamed Li, female engineers ask why, she was silent for a while a book in the receiver, and then hang up.


  3. the unit of qualification issued by the investigation?


Reporters noted that the review, monitoring processes, although strictly, but there are "internal circulation" phenomenon.


A Bureau of cultural relics officials said in an interview, the maintenance, design and construction, the engineer's qualifications are issued by the Bureau of cultural relics is superior, their experts review the maintenance programme, now the problem is investigated by them, would you effect?


  Extension


  Renovation of the great wall behind the depth of the dilemma


Promulgation of the regulations on the protection of the great wall for 10 years has made big achievements, but compared with the giant huge wall and protection needs, conservation efforts are still not enough, the chaos phenomenon in some places, protection becomes damaged.


Along the great wall because of County area economy in relative poverty, the maintenance funds of local governments is stretched thin. Suizhong County Bureau of cultural relics Deputy Director Liu Chunhua said in an interview, sz a length of more than 130 kilometers of the great wall in the territory, on the verge of collapse and lots of rescue relies primarily on State investment and local government can't afford. Investigators found that routine inspections, maintenance of this section of the great wall on the ground has not gone far enough.


Great Wall expert Dong Yaohui says, in addition to the national and local level to increase financial input in the conservation of the great wall, to mobilize social forces, encourage social capital through local legislation enters, establishing and perfecting the protection system of the great wall, making residents along the great wall protection.



Responsible editor: Wei chun





Article keywords:
Ancient cultural relics Bureau of cultural relics of the great wall in the field doubt

I want feedback
Save a Web page
A new culture
最美野外古长城修缮遭质疑 女工程师受访沉默挂电话|野外古长城|文物局|文物_新闻资讯

  原标题:最美野外古长城”变“平板路”“保护”工程真的合规吗?


锥子山长城大毛山段修缮后的容貌 新华社发

  在《长城保护条例》颁布10周年之际,辽宁绥中一段野外古长城最近成为舆论关注的热点。一边是作为国家文物的野外古长城在修缮中被抹为“平板路”,一边是文物部门坚称是按程序进行维修。究竟是保护,还是破坏?记者进行了调查。


  进展


  外壳将在三五年左右消失?


  近日,一条“最美野外古长城被砂浆抹平”的帖子在网上引发热议。有网友表示,这样的修葺还不如不修,感觉就是破坏。


  23日中午,记者上山查看了锥子山长城大毛山段修缮后的容貌,的确如网络上发布的照片所见,原先残缺的垛口墙被抹平,整齐垒砌的石头面上铺一层灰白色覆盖物,让它更像一条“平板路”。与附近地铺青砖、保留墙垛的长城相比,这段延绵500米左右的“平板路”显得突兀。


  当地多名文物部门官员介绍,这么修是经专家反复论证形成的方案。维修前,这段长城仅剩的石头地基残破不堪,为避免爬山者肆意蹬踏,以及雨水冲刷、冰冻风化带来更大损坏,方案采取归安加固工艺,把散落在地基外的石头归放回原处,然后进行灌浆、夯实加固。


  辽宁省文物局局长丁辉坦承,修成“平板路”的确不好看,但符合抢救保护需要。这种中间略高、两边低的平板状,加上覆盖一层三合土,防水效果好,夏季可抵雨水冲刷、冬天可防存水上冻。他强调,这段长城是抢救性修缮,是防止长城加速破损,“是否好看”并不是最重要的。


  据《新京报》昨日报道,国家文物局、辽宁省文物局组成联合调查组,对此事调查评估。经过现场勘查,调查组专家成员之一付清远表示,“所谓水泥路面并不存在,工程采用的是三七灰土外壳,起保护作用。这层外壳将在三五年左右风化消失。”


  背景


  维修获得1000多万补贴资金


  资料显示,位于辽宁绥中县永安堡乡的锥子山长城是全国文物重点保护单位,始建于明洪武十四年(公元1381年),是辽宁境内的明长城主干线。


  锥子山长城不少段点坐落在燕山山脉的险峻山岭之间,加上这里地处深山老林,原汁原味,有人称它为“最美野外古长城”。


  记者了解到,这段修缮的长城大约有1200米长。2011年,绥中县文物局针对长城整体破损严重,部分地段有险情,委托辽宁省文物保护中心设计了维修方案。随后,方案连续通过了省文物局和国家文物局组织的专家评审,共获得国家1000多万元的补贴资金。


  维修工程分4个标段,经招投标程序,分别由来自辽宁大连、沈阳和山东曲阜的四家古建公司施工,其中作为A标段的500米长城地基由大连园林古建公司维修,总造价300多万元,辽宁一家专业机构还对整个施工进行了全程监理。工程从2013年7月动工,2014年11月完工,目前已通过辽宁省文物局组织的技术验收,即将报国家文物局最终验收。


  在勘察现场,记者见到了赶来送施工资料的大连园林古建公司和山东曲阜园林古建筑工程公司几名负责人。他们表示,尽管条件十分艰苦,但公司严格按照设计方案施工,完全靠人工将一包包白灰和黄土从山脚背上来。


  质疑


  修缮、维护过程疑点颇多


  《长城保护条例》对修缮长城规定了十分严格的流程。维修申请和设计方案需向文物部门层层申报,各级文物部门都要组织专家组评审,工程设计、施工、监理等单位都必须具备相应资质。


  此次维修中,尽管相关单位资质完备,并严格遵守规定程序,但一些地方还是让人生疑。


  1.不少排水沟被堵住


  23日中午的勘察中记者发现,即便是新修地段,长城地面的不少排水沟已被泥土、碎石堵住,显然当地对这段长城的日常巡查、维护工作存有不足。


  2.使用的水泥块很难砸碎


  记者在山脚下的小河口村走访,多位村民反映,当时维修长城时,村民们靠往山上背水泥挣钱。在“被抹平”长城的不远处,记者发现多个编织袋,里面装有疑似凝固的水泥块,用石头使劲砸都很难破碎。


  为此记者拨打大连园林古建公司一位姓李的女工程师的电话询问缘由,她在听筒那头沉默了一阵,随后挂断。


  3.由颁发资质单位调查监督?


  记者注意到,评审、监督流程虽然严格,但存在“内部循环”现象。


  采访中一位文物局干部透露,此次维修,设计、施工、监理单位的资质都是上级文物局颁发的,维修方案也是他们组织专家评审,现在出了问题又由他们来调查,监督效果会好吗?


  延伸


  修缮长城背后的深度困境


  《长城保护条例》颁布10年来取得了不小成绩,但是与长城巨大体量和保护需求相比,保护工作仍有不足,一些地方出现了乱修的现象,致使保护变成了破坏。


  因长城沿线县区经济相对贫困,地方政府的维护资金也捉襟见肘。采访中绥中县文物局副局长刘春华说,绥中境内长城长度达130多公里,对濒临坍塌地段的抢救主要依靠国家投资,地方财政无力承受。调查人员发现,当地对这段长城的日常巡查、维护尚有不足。


  长城保护专家董耀会表示,除了国家和地方要加大对长城保护的资金投入外,要充分调动社会的力量,通过地方立法的方式鼓励社会资本的进入,可以建立健全长城保护员制度,使长城沿线居民都成为保护者。



责任编辑:隗俊





文章关键词:
野外古长城 文物局 文物 疑点

我要反馈
保存网页
新文化报



If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759