Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)
published in(发表于) 2016/11/24 9:56:02
67 dead, the collapse site project in Jiangxi province with total investment of 7.67 billion

English

中文

67 dead, the collapse site project in Jiangxi province with total investment of 7.67 billion

Twitter screenshots

[Jiangxi Yichun site collapse phase III project total investment of 7.67 billion] @ Nin released the previously published news, abundant cooling towers in April this year, built in three phases, in Jiangxi province, the largest hyperbolic cooling towers. Intends to build two high 168 m and 135 m in diameter hyperbolic natural draft cooling tower. Cooling towers are in which is discharged through the cooling of hot water cooled after repeated use, upon completion, will save a lot of water resources, to prevent the Gan River to dry up, preserving the ecological balance is important. On June 18 this year, Jiangxi ganneng third-phase expansion project from the construction to the installation phase. Electric three-phase expansion project at stone village West of fengcheng city drum Hill, with a total investment of 7.67 billion yuan, proposed 2 1 million-kilowatt ultra-supercritical coal-fired unit. Two units of production plans at the beginning of the end of 2017, 18 respectively electricity, when the annual electricity generation is expected to be up to 10 billion-kilowatt. Beijing times


(Editors: Biao Guo UN832)
2016-11-24 22:52:06
Integrated
江西致67死坍塌事故工地项目总投资达76.7亿

微博截图

  [江西宜春工地坍塌丰电三期项目总投资76.7亿]据@宜春发布 此前公布消息,丰电三期冷却塔于今年4月开建,为江西省内最大的双曲线型冷却塔。拟建成两座高168米、直径135米的双曲线型自然通风冷却塔。冷却塔是使冷却器排出的热水在其中冷却后重复使用,建成后将节约大量水资源,对防止赣江水干涸、维护当地生态平衡具有重要意义。今年6月18日,江西赣能丰电三期扩建工程建设由土建施工进入安装阶段。丰电三期扩建项目位于丰城市西面石上村铜鼓山,总投资额76.7亿元,拟建2台100万千瓦超超临界燃煤机组。两台机组计划于2017年年底、18年年初分别投产发电,年预计发电量将达100亿千瓦时。京华时报


(责任编辑:郭彪 UN832)
2016-11-24 22:52:06
综合




If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759