Go homepage(回首页)
Upload pictures (上传图片)
Write articles (发文字帖)

The author:(作者)aaa
published in(发表于) 2014/9/20 11:57:20
Chongqing section of the Yangtze River this year, the greatest peak flood

Chongqing section of the Yangtze River in this year's largest flood peak | | rainstorms _ news

Xinhuanet, Zhongqing, September 19 (reporter Li Song)-19th-20th, reproduction and jialing River in Chongqing section of the Yangtze River flood peak water levels, which appeared this year's largest flood peak since the Yangtze River, some section of the Super guarantee level. Chongqing Municipal flood control and drought relief headquarters to joint operation of the Yangtze River and jialing River basin water conservancy project, science against the flooding of the Yangtze River.


Reporters learned from the Office of the Chongqing Municipal flood control and drought relief headquarters, recently, Chongqing municipality suffered during continuous, widespread heavy rains, combined with the upper reaches of the Yangtze River and the jialing River, Sichuan, Guizhou, heavy rains, will appear into the Chongqing Yangtze River flood peak since 19th through the main city, influence, yongchuan district, jiangjin, banan, da, jiulongpo, 12 districts and counties.


According to the latest hydrological services forecast, caiyuanba Yangtze River stood 19th 184.6-meter flood water level occurred at 23 o'clock, 2.6 m above the warning water level; longevity 20th Jan at 8 o'clock there flood peak of the Yangtze River water level of 177 meters, warning 7 meters, ultra guarantees 3 meters. Jialing ciqikou station, 19th at 17 o'clock 185.00 meters of flood peak occurs, warning water level of about 2.3 meters.


For Science against flood, Chongqing anti-refers to strengthened and Yangtze River anti-total communication contact, through coordination TGP reservoir in 18th noon from discharged flow 35,000 cubic meters/seconds plus to 40,000 cubic meters/seconds of based Shang, from 19th at 2 o'clock up gradually increased discharged flow to 45,000 cubic meters/seconds, reduce upstream to water on Chongqing main city garden dam, and magnetic device mouth, regional of top supporting effects, further reduced longevity, and Fuling, and wanzhou, along city appeared Super standard flood of possibilities.


While, Chongqing anti-refers to for reduce jialing River flows through of hechuan city and Chongqing main city jialing section of flood control pressure, has requirements jialing River grass Street airlines electric hub Teng library welcome peak, gradually increased or control discharged flow, Yu 18th 20 o'clock Qian will dam Qian level control in 199 meters following, Yu 19th 0 o'clock will dam Qian level control in 198 meters following, ensure hechuan city not Super guarantee level for bottom line, do maximum reduce Beibei, and shapingba magnetic device mouth of flood control pressure.


Lu Feng, Director of the Chongqing Municipal flood control and drought relief command introduction currently, Chongqing city districts in accordance with approved flood prevention operation plan, scheduling within the purview of, strengthen reservoirs (hydropower), real-time scheduling, integrated upstream and downstream safety through barriers, water storage, delay, error, means such as cutting, minimize downstream flood control pressure.


(Edit: SN123)
18:33 on September 19, 2014
Xinhua NET


If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)





QQ:154298438
QQ:417480759